fadefade
•  current projects
•  ftp upload/download
•  message board
•  bidding documents

clients / contractors
•  architecture
•  land planning
portfolio
•  services
•  resumes
•  contact us

about us
•  construction
   management

•  civil engineering
•  surveying
•  landscape
   architecture

civil engineering
municipal
commercial
residential
rio tinto stadium   the pointe @ 53rd  /  taylor's boats  /  murray vine street fire station
Rio Tinto Stadium is a new 20,000 seat soccer stadium which is home to Real Salt Lake of Major League Soccer. The civil design involved nearly 2,000 feet of sanitary sewer main, including a bored canal crossing with the associated permits. Approximately 5,000 feet of culinary and secondary re-use water mains were installed as part of the project. Additionally, more than 40,000 cubic feet of underground stormwater storage, nearly 3,000 feet of stormdrain and an overflow diversion structure were also designed.